Case Study: Oil Removal Project for a New‑Energy Enterprise

August 13, 2026

Case Study: Oil Removal Project for a New‑Energy Enterprise

Project Overview

Item Parameter
Project Profile Oil Removal Project of a New‑Energy Enterprise
Treatment Capacity 250 m³/day
Influent TOC 200 ppm
Treatment Requirement < 60 ppm

Treatment Target

Influent TOC concentration: 200 ppm
Target effluent: < 60 ppm
Required removal efficiency: ≥ 70%

Project Features

It is a medium‑scale industrial wastewater oil‑removal scenario with a treatment capacity of 250 m³/day.
The TOC of raw feed water is 200 ppm and shall be reduced to below 60 ppm, placing certain requirements on oil‑removal efficiency and effluent stability.
Specific treatment processes and operational data can be supplemented and optimized according to actual conditions.

Conclusion

This project represents a typical oil‑removal scenario for wastewater in the new‑energy industry. With influent TOC of 200 ppm and the target effluent below 60 ppm (removal efficiency ≥70%), it provides practical reference for process selection and operation control.