Fluoride Wastewater Treatment Project: 15,000 TPD Capacity Reducing Fluoride from 7 ppm to Below 1 ppm

August 24, 2026

Fluoride Wastewater Treatment Project: 15,000 TPD Capacity Reducing Fluoride from 7 ppm to Below 1 ppm

Project Background

A large mining operation faced a critical water treatment challenge: its process water and mine drainage contained elevated levels of fluoride, making direct discharge impossible under increasingly strict environmental standards. The company needed a robust, high-throughput treatment system capable of handling its enormous daily water volume while meeting stringent effluent quality requirements.

Project Challenges

The fluoride-containing wastewater posed several technical hurdles:

  • Massive daily flow requiring a treatment capacity of 15,000 tons per day
  • Incoming fluoride concentration of 7 ppm, above regulatory discharge limits
  • Variations in water quality and suspended solids typical of mining operations
  • Demand for reliable, continuous operation with minimal downtime

Conventional single-stage precipitation methods often struggle to achieve ultra-low fluoride levels consistently, especially at such a large scale. A more advanced, multi-stage treatment approach was required.

Our Solution

We designed and delivered a complete defluorination system combining chemical precipitation, coagulation-flocculation, and advanced clarification stages. The system was engineered for high-volume continuous operation and automatic chemical dosing control to maintain stable effluent quality.

Key features of the system include:

  • Two-stage reaction tanks with precise pH and dosing control
  • High-efficiency clarification and sludge separation units
  • Automated monitoring and control for stable operation
  • Scalable modular design sized for 15,000 tons per day throughput

Technical Parameters

ParameterValue
Treatment capacity15,000 tons/day
Influent fluoride concentration7 ppm
Effluent fluoride requirement< 1 ppm
Treatment processChemical precipitation + coagulation + clarification

Results & Benefits

After commissioning, the treatment plant consistently delivered effluent fluoride concentrations below 1 ppm, achieving a removal rate of over 85% and fully meeting discharge requirements:

  • Fluoride reduced from 7 ppm to below 1 ppm with stable, reliable performance
  • Continuous treatment of 15,000 tons of wastewater per day without interruption
  • Fully automated operation reducing labor and chemical consumption costs
  • Compliance with environmental discharge regulations, avoiding penalties and shutdown risks
  • Minimal footprint with optimized sludge handling and disposal

Why Choose Us

This project highlights our expertise in treating high-volume industrial wastewater containing heavy metals and anions such as fluoride. From water quality analysis and process design to equipment supply, installation, and commissioning, we offer complete turnkey solutions tailored to each customer's needs.